Tioga Energy: Your path to solar. Accelerated
  • Contact
  • Careers
  • Login

SurePath Solar Process

A SurePath Solar PPA is best for customers that:

  • Own or have a long-term (10- to 20-years) lease for their facility
  • Have at least 40,000 square feet of space unobstructed from the sun available for the placement of solar panels
  • Currently pay average or higher than average electricity rates
  • Have a B++ or better credit rating and can provide audited financial statements
  • Want electricity price stability
  • Value environmental benefits

Our Process

Tioga: Tioga Timeline

Phase 1. Preliminary feasibility assessment, including data gathering and budgeting, that culminates in a Letter of Intent. This phase typically lasts only a few weeks.

  • Data gathering includes a review of the site and its suitability for a solar electricity installation and an assessment of current energy use.
  • Budgeting includes an estimate of savings from a solar energy system installation and development of a financial model and pricing structure for the PPA.
  • The Letter of Intent includes the details of the assessment and an agreement to sign a PPA during Phase II of the process.

Phase II. Design and project finalization period during which Tioga completes the financial agreement and applies for incentives and rebates on behalf of the customer. At the same time, the physical system is designed and engineered, all appropriate permits are obtained and the system’s components are purchased. The timing of this phase varies greatly by system size and complexity, but typically lasts 2 to 4 months.

Phase III. A 2- to 6-month phase of installation, inspection approvals and interconnection with the facility’s existing electrical infrastructure and the utility grid.

Phase IV. On-going operation and maintenance for the life of the PPA.

Contact us today to find out more about getting started with Tioga

 

Is a solar PPA right for your organization?

Run the numbers to find out Run the Numbers to See if Solar PPA is Right for You
 
 

Need more specifics?

Get the SurePath Solar data sheet
Surepath Logo
 
  • Home
  • About Solar
    • Why Solar?
    • How Solar Works
    • Glossary
    • Tioga Energy FAQ
  • Solutions
    • SurePath Solar PPA
    • SurePath Solar Process
    • Why Tioga?
    • Case Studies
  • Partners
    • Becoming a Tioga Partner
    • Tioga Energy Partner Portal
  • News
    • Press Releases
    • Tioga in the News
    • Tioga Events
    • Tioga Awards
    • Solar Industry News
  • Resources
    • Annotated PPA
    • PPA Score Calculator
    • Government Incentives
    • Efficient Energy
    • Become a Green Energy Company
    • Other Solar Information
  • About Us
    • Management
    • Investors
    • Careers
    • Contact Us
    • Areas We Serve
  • E-mail Page
  • Tioga Energy USATioga Energy, CA
  • Privacy Policy
  • Trademarks
  • Site Map

Copyright © 2008 - 2013 Tioga Energy, All rights reserved.